引用本文:
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载 本文二维码信息
码上扫一扫!
分享到: 微信 更多
Design of landing load for production casing in offshore oil and gas wells
LIU Xiu-quan1, CHEN Guo-ming1, CHEN Chao2, CHANG Yuan-jiang1, CHEN Li-ming1, ZHANG Wei-guo3, XIE Hua3
(1.Centre for Offshore Engineering and Safety Technology, China University of Petroleum, Qingdao 266580, China;2.Beijing Petroleum Machinery Company, Beijing 100083, China;3.Shenzhen Branch of CNOOC Limited Company, Shenzhen 518067, China)
Abstract:
A method for determining landing load of production casing in offshore oil and gas wells was proposed with consideration of uncemented casing strength and stability during well drilling and production. A computational mechanics model for multi-string coupled system was established. A method for calculating axial casing load during well drilling and completion was determined. Calculating equations of axial casing load during gas production were deduced with consideration of wellbore temperature, pressure and its end effect. Landing load of production casing in a gas field of the South China Sea was calculated according to the proposed method. The results show that casing strength is not a design factor of landing load of production casing in offshore oil and gas wells. Stability of production casing during gas production is an important factor for design of production casing landing load. Landing load of production casing is equal to the weight of uncemented casing when design extremal gas production is less than specific value. Production casing landing load increases with gas production increasing and the increase extent declines gradually when design extremal gas production is more than specific value.
Key words:  offshore oil and gas wells  design of landing load  production casing  gas production  mechanics model